Stakeout improvements

the application is excellent but it is not practical for surveying jobs. a text and non-visual indication of the layout direction is required, ideally having an address expressed in a unit of measurement in two directions. Example N 0.54 E 1.60 and thus be able to know where to define the point. Graphically it is very difficult.

3 Likes

Hi @agrimgalina,

Sorry for the late response.

This function is on our to-do list and will be released in one of the future ReachView versions.

Thanks for the suggestion :slightly_smiling_face:

1 Like

fantastic !!! thank you

This topic was automatically closed 100 days after the last reply. New replies are no longer allowed.