Reach RS2 and MicroSurvey FieldGenius

Unfortunately I think that because of the way that the Reach defaults to averaging in a point at startup that unless you are returning to the same project successively and using the same manual point that you will need to enter in a coordinate for the base point. Otherwise you will get a slightly different coordinate each time. This would be a nice feature and I think it would be possible in FG because of localization if Reachview complied. With Topcon you have the project loaded with the localized control point list and you tell the base which point it is starting up on, thus giving it the correct coordinate.

2 Likes

Hi @sdobrev85,

At the moment, we don’t have plans on adding such a feature. You can set up Reach base-rover communication in the ReachView app.

This topic was automatically closed 100 days after the last reply. New replies are no longer allowed.