When setting up my bass for RTK corrections, how long is an adequate amount of time to leave the base collecting before I start using the rover for ground control points? 15 minutes, 30 minutes, 60 minutes, more?
When setting up my bass for RTK corrections, how long is an adequate amount of time to leave the base collecting before I start using the rover for ground control points? 15 minutes, 30 minutes, 60 minutes, more?
A post was merged into an existing topic: Static Base