Hi @mkim,
If you collect points using the Survey project, there is no need to add 0.134 mm to a pole height.
Regarding OPUS post-processing, I’d like to post-process your logs myself. Would you mind sharing with me the logs and coordinates you expect to obtain?
You can share them in DM if you prefer.