Using Stop & Go in Emlid Studio to correct GCPs with PPP output

Hi kirill.pavlyuchuk,

Thank you very much for the reply.

So from what you said here: “The additional calculation in Excel is needed if you start processing before obtaining the NRCan solution. In this case, your base coordinates will be taken from the RINEX header, and those coordinates are of meter accuracy.”

  • There is no way to process Stop & Go in Emlid Studio if you receive the NRCan solution after the Stop & Go Survey? So Stop & Go is not possible with obtaining the solution after? Wouldn’t there be some way I can enter my NRCan solution in Emlid Studio and do everything in post?

From this post by elena.riazanova, she said that you are able to process AFTER getting the PPP solution: Post-Processing vs Survey Mode with unknown base position - #7 by EBE111057

Please clarify the difference in what you said and what elena said.

Thanks!