I have been Engineering and ‘surveying’ for 50 years. I do not have the full ACAD program so for this project I calculated baseline stationing by hand, then used a scrip to apply stationing [“chainage”], then I was able to use my RS3 to accurately gather points and stake out points for the project.
The RS3 has provided me with accurate locations in the field.